Mobile Phone
+8615733230780
E-mail
info@arextecn.com

Tanda Yamamei Copper Mine in Ecuador sees mines over one kilometer

 According to the MiningNews.net website, the results of SolGold’s first drilling in the Tandayama-America target area of ​​the Cascabel copper-gold mine in Ecuador showed ”significant potential” ”.
   TAM deposits have seen copper-gold mineralization in the 1st-7th holes, and the shallowest ore depth is only 20 meters.
   Mainly see mine situation:
  ◎Drill hole 1: 531 meters from the depth of 220 meters, the copper equivalent grade of 0.3%, of which 272 meters from the depth of 350 meters, the copper equivalent grade of 0.44%;
  ◎Drill hole 3: From the depth of 252 meters, the ore is 1040 meters, and the copper equivalent grade is 0.33%. Among them, the ore is 350 meters and the copper equivalent grade is 0.45% at the depth of 632 meters;
  ◎Drilling hole 5: From a depth of 218 meters, the ore is 426 meters, and the copper equivalent grade is 0.37%, of which 342 meters are ore at the depth of 230 meters, and the copper equivalent grade is 0.43%;
  ◎Drilling hole 7: From the depth of 230 meters, the ore is 522 meters, the copper equivalent grade is 0.38%, and the ore is 230 meters at the depth of 276 meters, and the copper equivalent grade is 0.44%.
   The results of the 8th hole are still waiting, and the 9th and 10th holes are being drilled.
   W020210526339826319245
The TAM deposit is 3 kilometers north of the Alpala deposit in the Cascavier project. The Measured and Indicated resources of the Alpara deposit total 2.66 billion tons, with a copper equivalent grade of 0.53%, which means that it contains 9.9 million tons of copper, 21.7 million ounces (675 tons) of gold, and 92.2 million ounces of silver (2867). Ton).
   W020210526339827328074
  The company believes that the TAM copper-gold mine will substantially increase the resources of the Cascavier project.
The    TAM deposit runs northwest and is 750 meters long and 500 meters wide. The mineralization extends from the surface to a depth of at least 1200 meters.
  The company plans to announce the first resource volume of the deposit at the end of the year. (Ministry of Natural Resources)

Post time: Jun-08-2021